Short Summary
A DTCP Approved Buildings has cleared Tamil Nadu’s town-planning scrutiny on land use, layout design and construction norms, which makes it legal property that lenders finance and future buyers trust.
It is important to verify the approval number, title deeds, and the jurisdiction of the property before booking it since unapproved layouts may face loan denials, lack of utility services, and difficult resales.
Read more on the difference between DTCP and CMDA, process of plan approval, and things you should look out for when purchasing land in Chennai.
Key Takeaways
- DTCP approval guarantees that the land in question complies with the state of Tamil Nadu’s land usage guidelines.
- As of 2022, the jurisdiction of CMDA planning was 5,904 sq km; hence, the importance of knowing whether your property is within this jurisdiction.
- Unapproved layouts receive loan restrictions; therefore, DTCP approval is very essential when getting a loan.
- Approved layouts attract more buyers and sell easily.
- The permission number, final layout drawing, patta and Encumbrance Certificate need to be verified before payment.
Why Checking Approvals First Matters When You Explore Ongoing Projects in Chennai
Understanding ongoing projects in Chennai involves considerations such as location, layout, facilities and launch offers. However, the critical element that will decide whether your investment will be successful or not is legal approval.
Buying a house that does not have all the necessary approvals means that you may end up getting refused in your loan application or may not be able to get an electrical or water supply connection.
In the state of Tamil Nadu, layouts and constructions in planning areas outside the Chennai Metropolitan Area are approved by the Directorate of Town and Country Planning (DTCP), whereas the Chennai Metropolitan Development Authority (CMDA) is responsible for approving layouts in the metropolitan area.
Understanding who the relevant authority is and what their approval entails is the difference between a safe purchase and a risky one.
What Does DTCP Approval Mean for Land Approval and Building Approval in Tamil Nadu?
The DTCP reviews plans and structures based on the Tamil Nadu Town and Country Planning Act, 1971 and Tamil Nadu Combined Development and Building Rules, 2019.
The issuance of the DTCP certificate is the proof that land usage, road width, open space allocation, and plots have been approved and that the properties bought are legal.
The jurisdiction determines the required approval:
| Approval Body | Applicable area |
| CMDA | Within the Chennai Metropolitan Area, extended in 2022 from 1,189 sq km to 5,904 sq km |
| DTCP | Planning areas in Tamil Nadu outside the Chennai metropolitan area |
| TNRERA | TNRERA: Projects with a land area exceeding 500 square metres or more than eight apartments must be registered with TNRERA, subject to applicable exemptions. This registration is required in addition to the relevant planning approval. |
A project must obtain planning approval from either CMDA or DTCP, depending on its location, along with TNRERA registration wherever applicable. CMDA and DTCP are alternative planning authorities, not two approvals required for every project.
The final layout sketch can be obtained only after the approval of the layout by the concerned local body, which can be a corporation, municipality or panchayat.
It is common for the developers to promote provisional approval, but do remember that it is just a technical approval; hence, ask for the final one.
Why a DTCP Approval Building Protects Your Loan Eligibility and Resale Value
When taking loans, banks and housing finance companies seek security that they can trust. Normally, they ask for a plan approval before financing is possible, while unapproved plans cannot attract finance.
You are expected to pay cash. An approved plan will allow you to acquire individual approval for construction and connections of utilities. In the same way, an approved construction will enable you to get finance.
A construction that deviates from the approved plan can attract notices and make financing difficult. Ensure you ask for a completion certificate if you are buying the second time.
Impact of resale. The next buyer of your property will need a loan just like you, and his bank will check the property just the same way you did.
An approved building attracts many buyers, registers easily, and commands better prices than those unauthorised buildings because only cash buyers will consider the property. Approval is an asset itself.
Take, for example, a case where two plots have been priced a few lakh rupees differently from each other, one being approved while the other one is non-approved. It is possible that even then the cost of the former plot could turn out to be higher due to the additional costs involved.
DTCP Verification: How to Check Approved Layouts Before You Pay
The DTCP-approved board is no proof. Follow the process given below:
- Demand the approval letter and approval number, and verify them against the approved layout plan.
- Verify the approval number at the official DTCP website (onlineppa.tn.gov.in) or DTCP office.
- Confirm whether your plot number and survey number are figures in the list of approved plots.
- Request the final approved layout plan. Since technical approval from DTCP or CMDA is followed by approval from the concerned local body, provisional approval alone is not sufficient.
- Cross-check the patta, chitta and encumbrance certificate.
- Search for the project on the TNRERA website for projects exceeding 500 sqm or 8 units.
- Ensure that the layout is not included in the list of CMDA unapproved layouts.
- Avoid any plot being sold with approval in process status.
End the verification process with a legal opinion.
Risks of Unapproved Layouts: Why DTCP Approval Cannot Be Skipped
The prices of unapproved plots are low, but there is a hidden cost involved here. Buyers could be denied loans, electricity, and Metro Water connections; approved building plans; and even demolition orders under the Planning Act; and most importantly, a plot which would only interest cash buyers.
In fact, Tamil Nadu itself provides some idea of the extent of the issue. In September 2016, the Madras High Court had put an embargo on the registration of unapproved plots, which was partially lifted thereafter.
Even in those circumstances, the State told the court that 9,760 unapproved plots had been registered from 9 September 2016 to 28 March 2017.
The government notification regarding the regularisation of unapproved plots and layout rules came in May 2017, and it was supposed to cover 13 lakh unapproved plots from 26,000 layouts, but there was an eligibility criteria for registration up to 20 October 2016.
The guidelines also mentioned that the owners and promoters, who do not go through the process, may end up having no power, water, drainage, and sewerage connections to their property.
As per the decision of the High Court in June 2017, the plots that have been changed from agricultural land prior to 21st October 2016 can be registered, but plots, which violate the court’s interim orders, cannot be registered. In brief, the law has always distinguished the approved from the unapproved land.
How Expanding Boundaries Change Approved Layouts Checks
Chennai is an example of why it is essential to check jurisdiction. The Greater Chennai Corporation spans approximately 426 square kilometres, but the CMDA’s planning region has been expanded to 5,904 square kilometres, covering Chennai, Thiruvallur, Chengalpattu, Ranipet and Kancheepuram districts.
Areas that fall in growth areas, such as Sriperumbudur, were some of the belts that were considered during the expansion process, while suburbs, like Tambaram, are usually within the metro area itself.
Consider the following illustrative example of a plot purchase near GST Road in Guduvancheri. Here, the buyer is told of tarred roads, streetlights and a grand DTCP-approved board at the site.
However, the main point is whether the exact plot exists on the approved plot list and whether the approval number gives an authentic record on the official portal. While the brochure is marketing, the portal record is proof.
The message for the buyer is practical. A plot in the growth areas might be sanctioned by the DTCP prior to the jurisdiction change and then by CMDA post-jurisdiction shift. Never assume anything; always check the sanctioning body and verify the sanction on the official portal.
| Expert TipsAlways ensure that you get the permission number, the final layout plan and legal opinion of the case from a lawyer before making any payment as an advance amount. Do not go by what the signboard or the broker tells you. |
Build Upon Approved Land: LML Homes & Their Legal Property Offerings
Building your dream home needs the right kind of paperwork. LML Homes is a Chennai-based real estate developer offering residential projects such as the League One and The Luxe One in Kattupakkam and Skyliving in Tambaram.
Designed specifically to give you a comfortable lifestyle in the city, whether you build upon CMDA-sanctioned land in the metropolis or DTCP-approved buildings beyond it, all the projects need to be thoroughly researched before purchase.
The buyers interested in ongoing projects in Chennai through LML Homes can discuss the approval process of each of these projects. Find out more at ig @lmlhomes
Make Approval Your First Filter, Not an Afterthought, When Choosing a Home
A DTCP approval building means much more than just the document. It is the key to hassle-free loans, smooth registrations, and fearless reselling. Prior to being impressed by a sample flat or launching discount, ensure that the permission number, approving authority, and TNRERA registration are all verified.
Verify them now, as this will protect your finances as well as the future of your family. Looking for a house with clear documents?
Frequently Asked Questions for DTCP Approval Building
Q. 1. What is a DTCP approval building, and what is its significance?
The DTCP approval building is a building which has a plan approved by the Tamil Nadu Directorate of Town and Country Planning after analysing land usage and construction rules. DTCP approval buildings make financing, utility connections, registration, and resale easier.
Q. 2. Are CMDA approval and DTCP approval one and the same?
No, CMDA approves a plan in the Chennai Metropolitan Area while DTCP approvals pertain to other planning areas of Tamil Nadu. Both are valid approving authorities. Check which approving authority pertains to your survey number.
Q. 3. How can I make sure my layout plan is approved as per DTCP?
Ask for the approval letter along with the permission number and validate the same through the official website or respective office. Ensure that your plot has been included in the approved plots list. Lawyer’s advice comes handy here too.
Q. 4. Is it possible to avail of a home loan on a plot that is part of an unapproved layout?
No. Banks and financial institutions are mostly concerned about the legitimacy of CMDA/DTCP approval before giving loans against the plot. These plots tend to have mostly cash buyers.
Q. 5. Does DTCP approval influence the resell price of property?
Yes. An approved property will pass all the checks required by the bank of the future buyer and sell to a wider audience. Unapproved plots will have lower prices and take time to sell.
Q. 6. What is the difference between DTCP approval and RERA registration?
While DTCP approval means approving the layout or building on the grounds of planning, RERA registration means regulating the project of the developer. Both of these are necessary for projects beyond 500 square metres or eight units.
Q. 7. What is the difference between provisional and final approval of the layout?
Provisional approval is a technical clearance provided by DTCP or CMDA. The final layout drawing comes later when the local body approves the layout. Ensure you get the final approval.
Q. 8. Can unapproved layouts be regularised in Tamil Nadu?
According to the 2017 regulations for regularisation, unapproved layouts registered up to 20 October 2016 will qualify for regularisation. Buyers must not take the chance that future regularisation will happen.
Q. 9. What are the other documents which need to be verified along with the approval letter?
The sale deed, patta, chitta, encumbrance certificate, and layout plan have to be checked. For projects, one needs to get the TNRERA registration number.
Q. 10. What could go wrong if I buy a plot in an unapproved layout?
You could encounter problems like denial of loans, lack of electricity and water connections, rejection of your building plans, and demolitions. Reselling also could become impossible.